Projects Gallery

Alexandria, VA - December 2020

Built in the 1800s
Triple Brick Construction
Weighed 430 Tons
View Project

TImberville, VA - October 2020

3000' sq ft Farmhouse
Moved 500 Yards Across a Pasture
View Project

South Brunswick, NJ - August 2020

Shored 14 Columns
Used Custom Shoring Stands
View Project
Yale House Move 1

New Haven, CT - August 2020

Historic Frame House Built In 1807
Relocated 500' Down the Street
31'x63' With Two Chimneys And Fireplace
View Project

South Windsor, CT - August 2020

2-story Frame House
Brick Veneer and 3 Fireplaces
Lifted 7' To Replace Crumbling Foundation
View Project

Kershaw, SC - August 2020

1-Story Frame School Building
38'x58'
Moved 100' in Initial Relocation
View Project

Montclair, NJ - August 2020

Supported the Upper Two Stories of a Quad-Brick Wall
Shoring in Basement and 1st Floor System
Shoring for Center Column Replacement
View Project

Indianapolis, IN - July 2020

22'x45' Triple Brick Building
Weighed 345 Tons
Moved 1500'
View Project
Triple Brick House Move 1

Arkport, NY - July 2020

218 Tons with Steel Beams
Moved With Fireplaces and Porch Roof
Moved 90' Back From Road
View Project

Reading, PA - July 2020

Built in 1847
23'x29' 1 ½ story
Moved 1.5 miles
View Project

Bear Lake, MI - June 2020

34'x57' Frame House
Moved With Fireplace, Chimney, and Garage
Threatened By Shoreline Erosion
View Project

Willington, CT - April 2020

Lifted 7' For Foundation Replacement
28'x75' 2-Story Frame House
View Project
Utah Bangerter Building Move

South Jordan, UT - March 2020

Weighed 400 Tons
18,000 Sq Ft
One of the Largest Buildings Moved in Utah
View Project
Charleston House Lift

Charleston, SC - February 2020

Historic Charleston House weighing 360 tons
Lifted 8' to Avoid Flooding
Circa. 1857
View Project
Historic Roslyn Gristmill

Roslyn, NY - January 2020

Historic Roslyn Gristmill - circa. 1715
Elevated 5' to replace the existing foundation
Dutch Framed Industrial Architecture
View Project

Bismarck, ND - January 2020

145'x 182' 4-Story Commercial Office Building
Shored Twelve Columns
Used 52 Buckingham 5" Bore Jacks
View Project
Wolfe House & Building Movers

Chesterton, MD - November 2019

Moved 100' back on the property
Dimensions: 33' x 40'
Wood frame structure, 1.5 Stories
View Project
Connecticut House Lift

South Windsor, CT - October 2019

House lifted 7' with deck & fireplace
52' x 70', 2 Story House with brick veneer
Failing foundation needed to be replaced
View Project
USS Sequoia Relocation

Deltaville, VA - September 2019

Presidential Yacht from 1931 to 1977
182,000 lb, 104' long Wooden Yacht
Barged from Virginia to Maine
View Project

Allentown, PA - September 2019

94'x16' Sections of Steel and Concrete
Each Bridge Section weighed 280,000 lbs
Accelerated Bridge Construction done over a 55-Hour period
View Project
House Lift, House lifting, Raising a House

Ashford, CT - August 2019

33'x 69' 2-Story Frame House
Lifted 5' with Enclosed Porch & Chimney
Failing Foundation Replacement
View Project

Philadelphia, PA - July 2019

Supported a 2.5 Story Stone Masonry House
Weighed over 1,000 Tons
Excavation done underneath while supported
View Project

Lancaster, PA - June 2019

Two 17'x30' Carriage Houses
Moved 200' and Rotated 90° On Site
View Project
Pumping Station

Detroit, MI - May 2019

20'x20', Historic Stone and Brick Structure
Moved 100' by the Buckingham Power Dolly System
View Project
carolina beach house raised about 30 feet off ground on supports.

Carolina Beach, NC - April 2019

Lifted to 21' Above Grade
Dimensions: 33' x 70'
1.5 Story House
View Project
Corner view of historic brick building on dolly.

Fort Wayne, IN - February 2019

100' Long, Triple Brick Building
Weighed 600 Tons
Moved 500' Across the Road
View Project
Crew next to harriman building raised off ground.

North Adams, MA - January 2019

53'x98' Frame Office Building
Moved on 4 Dollies
Moved 250' on the Property
View Project
Jewish historic synagogue on dolly moving through city streets.

Washington, DC - January 2019

25'x59' Triple-Brick Building
368 ton
Moved 50' to Storage Location
View Project
Spanish American War Monument being carried through street.

Charlotte, NC - October 2018

30' Tall
Weighed 35 Tons
Moved w/ its Concrete Footer
View Project
Odette's building on dolly moving through the street.

New Hope, PA - October 2018

Historic Odette's Restaurant Building
Weighed 387 Ton
Moved on 15 Buckingham Dollies with SmartSteer
View Project
Lenox Depot

New Lenox, IL - August 2018

36'x82' Masonry Depot
Weighed 200 Tons
Moved 5 Miles
View Project
Willow valley chapel traveling on dolly.

Lancaster, PA - August 2018

48'x70' Frame Chapel
Moved the Concrete Slab Floor
Weighed 250 tons
View Project
Emply warehouse with multiple supports.

Norristown, PA - July 2018

11,000 sq ft Roof Lifted
Lifted for 23' Clearance
View Project
Historic Livery Building Relocation raised on dolly.

Indianapolis, IN - July 2018

36'x66' Triple Brick Building
Moved 100' Across the Parking Lot
Moved on the Buckingham Power Dolly System
View Project
Historic House on dolly wheels turned.

Boston, MA - June 2018

Triple Brick Historic Building
Weighed 375 tons
Moved 300' across the Campus
View Project
Roof Raising - Rochester, NY empty warehouse.

Rochester, NY - March 2018

24,300sf Roof
Raised 9' 5"
View Project
How Much Does It Cost To Move a Building?

Learn about the key factors that affect the cost to move a house or building.

Go to Cost Estimate Guide »
Top