Commercial Brick Building Moved in Minneapolis

Minneapolis, MN / December 2021

a brick building pulls out into the street
Wolfe installs beams under a brick building
a 22'x66' brick building sits on wheels ready to be moved
a large brick building is moved into the street
the foreman steers a 22'x66' building around a corner and into the street
A police car blocks the street as a brick building is driven down it
A brick building is driven to its new location
a brick building pulls out into the street
Wolfe installs beams under a brick building
a 22'x66' brick building sits on wheels ready to be moved
a large brick building is moved into the street
the foreman steers a 22'x66' building around a corner and into the street
A police car blocks the street as a brick building is driven down it
A brick building is driven to its new location

Services

Minneapolis, MN / December 2021

This 2-story, triple-brick building relocation happened in two stages. For the first part of the move, Wolfe cut the building above the foundation, installed steel beams, lifted it, and slid it sideways several feet, where they placed it on Buckingham dollies. We moved the building a couple hundred feet to a temporary staging location and set it on cribbing while the new foundation was prepared. When the foundation was finished, we drove the building over the poured foundation and supported it while the new foundation walls were built up and grouted in place under it.

 

Specs

Triple-brick Commercial Building

Two-Stage Move

Relocated Without Floor